Sutton Point

Published on 19th September 2018
Solar PV Panels, Sutton Point
  • Division: Renewables
  • Client: Sutton Point
  • Location: Sutton
  • Sector: New Build

Principal Contractor: Ardmore Construction

Installed: September 2018

Total Installed Capacity (TIC): 18.76kWp

Expected generation per annum: 15,430kWh

Carbon emissions reduction per annum: 8,008kgs

Equipment

  • Sunfixings Bespoke Made Mechanically Fixed System
  • 56 x LG 335W Neon 2
  • 28 x SolarEdge P700 optimisers
  • 1 x SolarEdge 17k

Summary:

The client needed to achieve 15078.99kg of CO2 per annum to contribute towards the carbon reduction target as set by the local planning office. Avonside was able to provide this by using 56 x LG Solar 335W high-efficiency panels in order to maximise the output given the tight space, alongside a bespoke made Sunfixings East West mechanically fixed system, maximising power density. SolarEdge optimiser and inverter was used in order to mitigate shading form the surrounding equipment and the neighbouring Centre Tower.